Cem-Tec, a manufacturer of steel light poles in business since 1974, approached Eagle Alloy, Inc. with an emergency order. Due to an unforeseen supply-chain issue, they needed to find a new foundry to manufacture one of their popular products. With orders in and customers waiting, the clock was already ticking.
The following case study illustrates the steps Eagle Alloy followed to transfer casting of the product to our facility and to ensure that Cem-Tec had high-quality products ready for their customers as soon as possible.
At Eagle Alloy, an expedited timeline doesn’t mean we skip any steps. We still perform a detailed APQP analysis, make aesthetic and structural improvements to the design, conduct a company-wide review of manufacturing plans and rigorously test a sample batch.
Cem-Tec was able to provide us with CAD files, blueprints and tooling from the original supplier, along with physical samples of the part. We then interfaced with their team through a number of virtual meetings to obtain necessary information for our APQP report. In addition to the shape and the function of the part, we learned that it will be constantly exposed to the elements, and must be durable enough to last through years of wind, rain and snow.
Since the original version was aesthetically and functionally adequate, we didn’t want to design the entire product from the beginning. Instead, we reverse engineered a new (and improved) version and made changes only where necessary.
We started by using a handheld laser scanner to evaluate the tolerance conformity and surface quality of the previous supplier’s parts. We then imported the CAD files and evaluated the blueprints. Based on data from our laser scanner, prior experience and software models, we made several adjustments. Some of our changes improved the part’s appearance, while others made the part stronger and more repeatable for manufacturing.